top of page

Standby Generator Installation in North East Texas

Getting Started is Easy

We’ve simplified the process so you can go from planning to protection without the stress. Here’s what to expect — step by step.

1. Free On-Site Consultation

We start with a no-cost visit to your home or business to

evaluate your power needs, determine the best generator

size and placement, and answer any questions you have.

 

2. Transfer Switch Installation

Our licensed electrician installs the automatic transfer switch —

the device that allows your generator to take over

when the grid goes down.

 

3. Generator Placement

Next, we place your generator on a prepared pad or surface

near your home, following all local codes and clearances.

 

4. Electrical Connection

We run electrical lines from the transfer switch to the

generator, ensuring a clean, safe, and

code-compliant installation.

 

5. Fuel Hookup

Our licensed plumbing partner connects your generator

to a reliable fuel source — either natural gas or

propane — so it’s ready when you need it.

 

6. Final Testing

Once everything is connected, we perform a full system

test to confirm that your generator is ready to automatically

power your home or business during the next outage.

This is NOT a DIY project. At the time of your

site inspection your sales representative will

go over every detail with you. Use the form

 to schedule a call from one of our customer

service team members!

Request a Consultation

Multi-line address
I am interested in
How should we reach you?
Call
Text
Email
Yellow Background

WIN A FREE GUN SAFE!

CLICK HERE TO ENTER

Pride Electrical GiveAway

(214) 301-5106

Regulated by the Texas Department of Licensing and Regulation

 P. O. Box 12157, Austin, Texas 78711

 1-800-803-9202, 512-463-6599

TECL# 37654

ME# 592256

 

Accessibility

bottom of page